The foundation type is not a matter of taste: it is set by the soil, the weight of the house and basement plans. How strip, raft and piled foundations work and where they fit.

The foundation is the least visible yet most responsible part of a house. The entire weight of the building passes through it into the ground, and a mistake in the foundation later shows up as cracked walls, distorted openings and a damp basement. Clients often ask which foundation is best. The right question is a different one: which foundation suits this soil, this load and this plan?

What determines the choice

The main source for the decision is the geotechnical investigation. The bearing capacity of the soil, the uniformity of its layers, the groundwater level and how the soil reacts to seasonal changes determine the type and depth of the foundation. The same house may need a different foundation on different plots.

The second factor is the building itself. The number of storeys, the weight of the wall material, whether it has a frame or load-bearing walls, and the spacing of columns shape the load on the foundation. The third factor is the plan: if a basement, underground garage or plant room is intended, it fundamentally changes the foundation solution.

Seismic conditions are also taken into account. In seismically active areas, it is especially important that foundation elements are tied together and form a single system with the frame. These requirements are set in the structural calculations.

Strip foundations

A strip foundation is built as a continuous reinforced concrete band under the load-bearing walls or lines of columns. It is widely used on firm, uniform soils, especially for houses with load-bearing walls. If a basement is planned, the strip can also serve as the base of the basement walls.

The width and depth of the strip are determined by calculation. Its weak point is variable ground: a strip resting partly on a firm layer and partly on a soft one can settle unevenly and crack the building. In that case the ground is improved or a different foundation type is used.

Raft foundations

A raft foundation is a thick reinforced concrete slab covering the entire footprint of the building. Because it spreads the load over a large area, it reduces the pressure on the soil and is preferred on weak or variable ground. The raft also acts as the floor base for the ground floor or basement.

A raft usually needs more concrete and reinforcement, but in some cases it removes the need for ground improvement and deep excavation. Beneath the slab, a blinding layer, waterproofing and, if the design requires, thermal insulation are installed. Service penetrations are set with sleeves before the concrete is poured, because drilling through the slab later is undesirable.

Piled foundations

A piled foundation transfers the load through weak upper layers to a firmer stratum deeper down. Piles are either bored and cast in place or driven as precast elements, and they are tied together at the top by a connecting beam or slab known as a pile cap.

This type is used where weak soil is deep, the water table is high, or construction is on a slope. Designing a piled foundation needs accurate geotechnical data: the length and number of piles depend on the depth of the firm layer.

Waterproofing and drainage

Whatever the foundation type, it must be protected from moisture. Waterproofing is applied to surfaces in contact with the ground and covered with a protective layer so it is not damaged during backfilling. A damp-proof course between foundation and wall stops capillary moisture rising.

Where the water table is high or the soil is clay, a drainage system is laid along the foundation. Around the building, a paved apron and falls are planned to carry rainwater away from the walls. These details may seem minor, but whether the basement stays dry depends on them.

Typical mistakes

  • Copying the neighbour's foundation without a geotechnical investigation.
  • Pouring concrete without checking the mix quality or compacting it by vibration.
  • Failing to provide the required concrete cover to reinforcement.
  • Forgetting service penetrations and drilling the foundation later.
  • Starting masonry before the concrete has had time to cure.

Every one of these errors stays hidden in concealed work, and fixing it later costs many times more than was saved during construction. That is why foundation work is inspected with a technical supervisor present and documented with records.